« back

SG signs for the towers at the new “Clarion Hotel Post” in Gothenburg.

2010-06-17


The base building is the historical Main Post Office that is being restored externally
and rebuilt to a modern hotel internally. In the court yard of the old building (raises)
a new 13 story tower raises. The tower is divided by a glass slit separating the two
very different façades. Facing north the tower has a Slate and Glass cladding while
the south side is covered with pre oxidized Copper and Glass.

“The challenge will be to maintain a constant logistic flow all through the project”
says Jerker Johansson, the project leader at SG. There is no room on site to store
any materials. All façade elements will be pre manufactured in SG´s factory in Lysekil
and transported to the site in a specific installation order.”

News & press

Grand opening of Clarion Hotel Post.

2012-01-24

A new hotel built with Skandinaviska Glassystem premanufactured façade panels, opens up in Gothenburg.

Read more »

Station Triangeln in Malmö, winner of the Kasper Salin Award 2011

2012-01-17

Read more »

New address for the GBG office

2011-12-01

During fall SG have expanded in to new additional offices in the same building at Sjöporten in GBG.

Read more »

World Architecture Festival Award 2011

2011-11-29

“This unique natural, cultural and mythical landscape has formed the basis of the architectural idea. The building design is based on a rigid outer shell and an organic inner core.

Read more »

SGS was in September -2011 rewarded outer skin contract for the new head office to Swedbank.

2011-10-31

Read more »

Skandinaviska Glassystem AB phone +46 (0)31 651 650 Sjöporten 2 SE-417 64 Göteborg